modular defence infrastructure
mod compliant buildings
At Modulek, we specialise in solving complex challenges for the MOD and related organisations. Because the bulk of construction work takes place within our controlled factory, we deliver projects on live military bases without disrupting ongoing operations. Military readiness must continue around the clock, which is why our construction process has been refined to minimise operational interference.
This approach explains why MOD, DIO and other defence procurement teams consistently choose Modulek for projects across UK defence installations. Our hybrid construction methodology delivers the rapid deployment you need whilst providing the permanent design life your budget demands.
minimal disruptions with offsite manufacturing
Modular military Facilities
Our experiences cover specialist accommodation, welfare buildings and training facilities on military sites. Each project is engineered to work within the unique constraints of specific defence locations. What sets us apart? We understand the requirements of the defence industry and deliver modular facilities tailored to your site. Buildings that exceed the military standards and continue to perform for decades.
Our experts do more than adapt civilian specifications for defence use. Our design teams engineer buildings specifically for military applications, with JSP 315 building performance standards and JCOP 10.1 fire compliance integrated from the earliest concept stages. We sit down with your stakeholders, understand mission-critical requirements, and engineer bespoke and reliable defence infrastructure solutions.
Using our hybrid construction approach, we manufacture offsite because it makes operational sense. With less time on base, fewer security measures are required. There is minimal disruption to training cycles and clinical operations. When modules arrive for installation, they are virtually complete, cutting on-site work from months to weeks.
The sustainability advantages are equally compelling. With the MOD’s Net Zero targets becoming increasingly important, our modular construction methods typically reduce embodied carbon by 40% compared to traditional construction approaches.
case study – RMA Lympstone
Royal Marines Training Centre, Lympstone
Modular construction on a live site
The Royal Marines had an urgent need for new housing facilities, but without the construction process interfering with their operations. In response, Modulek delivered a new 1,000m² accommodation block within a 14-week timeframe. This full turnkey project was completed under budget and without interrupting training. The modular facility stood ready for immediate occupancy and fully operational from day one, ensuring that the Royal Marines could maintain their rigorous training schedule.
Why Defence Procurement Teams Choose Modulek
Rapid deployment with minimal operational impact
Exceeds MOD and JSP requirements
Future-proofed construction methodology
Military-specification security integration
Full project management
Significant cost savings
Reduced carbon emissions
Reliable offsite manufacturing
Proven modular construction expertise

Start Your Defence Infrastructure Project
Whether you are planning next year’s infrastructure upgrades or need solutions for immediate operational requirements, our defence infrastructure experts are ready to show you what is possible.