we’re dedicated to maintaining
a stringent quality control system
We operate in accordance with a comprehensive Quality Control Program which has been audited and accredited by an external organisation – United Registrar of Systems Ltd (URS) and complies to ISO 9001 and ISO 14001.
proud to be a
trusted partner – from start to finish
Our expert team are here to work with you every step of the way to design and construct your project. For more information on why Modulek are viewed and trusted by so many clients, click on the links below.
learn more about
who we have worked with
Our buildings are affordable and designed to meet your every need; allowing organisations of every type to achieve their dreams.
Cerne Abbas C Of E First School
Cerne Abbas First School required modern, purpose-built educational facilities to accommodate a growing student population whilst maintaining the character of their historic Dorset setting. To support their rising enrolment, we delivered a permanent modular school building containing a new classroom and office on a highly constrained roadside site. Provided as a full turnkey package and completed in just 12 weeks, the project shows how our hybrid off‑site modular construction methods bring speed, certainty and minimal disruption to active school environments.
Read more
Black park Cafe
Black Park Visitor Café and Toilet facility — a proud milestone as Modulek’s first net zero building in operation. Thoughtfully positioned within the stunning woodland surroundings, the building offers a bright, modern café space alongside fully accessible public washrooms, designed to blend seamlessly with the natural environment through a contemporary yet sensitive aesthetic.
Read more
Cranmore School
Cranmore School is one of the country’s top independent schools. The school’s science centre was no longer fit for purpose, and needed to be replaced by a new ‘wow’ factor building that could help lift the school’s learning environment. The two run-down Portakabin buildings that were in use were demolished and a new state-of-the-art learning area was installed. The new 2 storey building houses 9 teaching areas and operational rooms for the subjects.
Read more
Hamble Yacht Services
Hamble Yacht Services required a new commercial building that would sit sympathetically on the beautiful Hamble River, as well as provide new rental spaces and facilities for tenants at the marina.
Read more